in-situ stress research

Unique technologyof

the complete in-situ stress evaluation technology system

Technical Features

To be equipped with a set of in-situ stress research system including points, lines, planes and bodies under the efficient quality control.

Technical Features

Three kinds of pressure must be predicted before drilling the complex high-steep structures so as to ensure the security of drilling and the drilling rate could be improved by 6 times.

It only takes 19 days to drill a well, and the drilling rate is 6 times higher than that of wells in the work area.